苏州莱瑞测信息科技有限公司

翠鸟SCS认证咨询|审核员根据企业现场及文件对标评估审核

 
 
单价 面议对比
询价 暂无
浏览 16
发货 付款后3天内
品牌 SCS认证咨询
过期 长期有效
更新 2022-11-11 11:40
 






详细说明
6. evaluation of Requirements 评估要求
6.1. Desk Audit 文件审核
The manufacturer shall submit all necessary forms, records, documents, and data to SCS for review. 
The auditor will review the submitted evidence and assess the manufacturer’s conformance with 
respect to the requirements of the Standard (Section 5.0 Requirements).
生产企业向 SCS 提交所有必要的表格、记录、文件和数据以供评估。审核员依据标准要求审阅
生产企业提交的证据,评价对标准的符合性。
6.2. onsite Audit 现场审核
The manufacturer and/or supplier(s) of recycled material may undergo onsite audit(s) if deemed 
necessary based on the submitted evidence and ability of the auditor to assess the manufacturer’s 
and/or supplier’s conformance to the Standard.
根据提交的证据和审核员评估生产企业和或供应商对标准的符合性,如有必要时需要进行现场
审核。
6.3. Audit Findings 审核发现
After the completion of the desk or onsite audit the auditor may have formal audit findings regarding 
the degree of the manufacturer’s compliance with the requirements of the Standard. The three
types of findings include:
完成文件审核或现场审核之后,根据生产企业对标准的符合程度,审核员形成正式的审核发现。
审核发现有三种类型:
6.3.1. Non-Conformity Report 不符合项报告
A Non-Conformity Report (NCR), defined as non-fulfillment of a specified requirement, shall be 
adequately resolved through root-cause analysis and corrective/preventative action before 
certification can be granted.
不符合项报告(NCR),是指完全不符合具体的要求,获得认证之前,应进行原因分析并采取改
正/预防措施关闭不符合项。
6.3.2. New Information Request 新的信息要求
A New Information Request (NIR), defined as a request for mandatory information that may be 
necessary to determine compliance, shall be adequately resolved through root-cause analysis and 
corrective/preventative action within an established deadline.
新的信息要求(NIR),是指对于决定是否符合的必要的强制信息,需在指定的时间内进行原因
分析并采取改正/预防措施。
6.3.3. Opportunity for Improvement 改进机会
An Opportunity for Improvement (OFI), is defined as a concept that will surpass minimum 
requirements. Certification is not dependent on the fulfillment of an OFI, and root-cause analysis and 
corrective/preventative action are not necessary.
改进机会(OFI),是指已经超越了最低要求的概念。改进机会不影响认证决定,进行原因分析
并采取改正/预防措施不是必要的。
举报收藏 0
更多>本企业其它产品
EUCERTPLAST认证辅导重点评估废水废弃物与能源消耗 EUCERTPLAST认证|重点关注回收材料的可追溯性与含量
网站首页  |  网站介绍  |  版权声明  |  积分规则  |  定制推广  |  服务协议  |  隐私政策  |  联系我们  |  排名推广  |  会员服务  |  广告服务  |  网站留言  |  RSS订阅  |  网站地图  |  违规举报